HAZID Study – FEED for Barzan Gas Plant, LR2 capacity enhancement , & MP wastewater stream facilities of Qatar Gas.
January 9, 2024
iFluids Engineering and Consultancy WLL was awarded to perform a HAZID study for EPIC various facilities of Qatar Energy, including: What…
SIL Study for Safe Reuse & Recycling of Treated QG1 & PMP Wastewater at Qatar Gas
January 9, 2024
The objective of the project is to carry out Comprehensive study and develop FEED (Front End Engineering Design) work of…
HAZOP Study – EPIC for DR Plant, NG Supply System Facilities, Subsea pipelines, Compressor Houses, Onshore Gas Plant, & Catalyst Mix Tanks, Qatar
January 9, 2024
iFluids Engineering and Consultancy WLL was awarded to perform HAZOP study for the following projects: What is a HAZOP Study? A…
SIL Assessment & Verification EPIC for Utilization of Produced Water and Effluent Water Treatment at Qatar Energy
January 5, 2024
Introduction: iFluids Engineering & Consultancy W.L.L. was awarded the task of conducting the SIL Assessment & Verification study for the…
HAZOP Study EPIC for Cooling water system, Flow meter, Pipelines, Degassing stations, & Water treatment plant facilities of Qatar Energy
January 5, 2024
iFluids Engineering and Consultancy WLL was awarded to perform HAZOP study for EPIC various facilities of Qatar Energy including : What…
Surge Analysis for Laffan Refinery Zero Liquid Discharge (ZLD)
December 29, 2023
iFluids Engineering and Consultancy WLL was awarded the contract to perform Surge Analysis for Laffan Refinery Zero Liquid Discharge (ZLD)…
HAZID & HAZOP Study for ORYX GTL Underground Cooling Water System Replacement
December 28, 2023
Introduction iFluids Engineering & Consultancy WLL conducted a comprehensive HAZID (Hazard Identification) and HAZOP (Hazard and Operability) study for the…
Safety Integrity Level (SIL) Study for Dolphin Energy’s Onshore Plant
December 22, 2023
Overview of SIL Study for Dolphin Energy iFluids Engineering and Consultancy WLL was entrusted to perform a Safety Integrity Level (SIL)…
Quantitative Risk Analysis (QRA) for the Al SEEF Petrol Station
December 22, 2023
iFluids Engineering and Consultancy WLL was awarded to perform Quantitative Risk Analysis QRA for the Al SEEF Petrol Station What is…
HAZOP study for EPIC -Sewage Operating Systems, LR1 & LR2 (Refinery) FEED line , Barzan Onshore Asset, & LNG Flash gas exchanger facilities of Qatar Gas
December 8, 2023
iFluids Engineering and Consultancy WLL was awarded to perform HAZOP studies for EPIC various facilities of Qatar Gas, including: What…