MAH Risk Register, Qatar

What is MAH ( Major Accident Hazard)

A Major Accident Hazard is a potential source of danger that could lead to a major incident, resulting in multiple fatalities and/or significant harm to plant, equipment, or the environment. Objective of MAH (Major Accident Hazard) risk register development exercise is to develop detailed / comprehensive MAH risk register which are dynamic in nature and can be regularly maintained for tracking live compliance status.

MAH risk register development will be done comprehensively, which captures unit level / equipment specific MAH scenarios and incorporate the outcome from Technical Site Survey report, Bow Tie development workshop, MCEs and MCTs developments workshop, Performance Standard development exercise for MCEs and MCTs, MOPO development exercise, Vehicle impact assessment and QRA.

Why Is an MAH Risk Register Important?

An MAH Risk Register provides a consolidated view of the major accident scenarios associated with a facility and the measures in place to prevent or mitigate them. It helps connect the findings of different safety studies with specific hazards, consequences, safeguards, recommendations and responsible actions. This provides better traceability between identified major accident hazards and the controls required to manage them.

Unlike a static hazard list, an MAH Risk Register can be updated throughout the project and operational lifecycle. Changes identified through engineering modifications, safety studies, site surveys, safeguard verification, operational activities or risk assessments can be incorporated into the register.

This approach helps organizations maintain visibility of:

– Major accident scenarios and their potential consequences
– Existing preventive and mitigation safeguards
– Additional risk reduction measures
– Safety-critical controls and assurance activities
– Recommendation and action status
– ALARP requirements
– Applicable compliance and PSM requirements

Steps involved in the development of MAH risk register

This image illustrates a flowchart outlining the process for developing a Major Accident Hazard (MAH) risk register. It starts with data gathering and proceeds to MAH identification, followed by the formulation and development of the MAH risk register. Next, a risk ranking exercise is conducted for each MAH. The process then focuses on satisfying the criteria of "As Low As Reasonably Practicable" (ALARP) for all MAH scenarios. From there, recommendations are provided for identified gaps, including ALARP demonstration and cost-benefit analysis (CBA). These recommendations undergo challenge sessions for acceptance and approval by the client. Once approved, they are mapped against relevant Process Safety Management (PSM) elements. The final steps involve drafting a report presentation for the client and delivering the final report after incorporating comments.
Steps involved in the development of MAH risk register is shown in this flowchart
  • Data gathering
  • MAH identification
  • Formulation of MAH risk register
  • Development of MAH risk register
  • Action/Recommendation
  • Report
  • The term “MAH” refers to an uncontrolled event that may occur during the operation of a Facility, installation, or project. Such an event has the potential to cause a fire, explosion, or release of Hydrocarbons, Chemicals, or other substances that could result in multiple fatalities or serious personal injury to multiple individuals.
  • Additionally, an MAH event may cause significant damage to Facility, installation, or equipment, including a loss in the stability of the installation. Furthermore, an MAH event may result in major environmental consequences.
  • MAH identification will be done by referring HAZID, HAZOP, LOPA / SIL, QRA and SIMOP, where MAH identification was already carried out and include those identified MAHs into the facility MAH risk register.
  • The risk ranking revalidation exercise is intended to identify the wrongly attributed MAHs or missed MAHs from these reports and include the right MAH scenarios in MAH risk register.

Process Safety Studies Supporting an MAH Risk Register

An MAH Risk Register is developed using information from multiple process safety and risk assessment activities. The findings from these studies help establish credible major accident scenarios and identify the safeguards required to manage them.

  • HAZID is used for systematic identification of the cause and consequence of safety and environmental hazards and their safeguards. This method is used to identify credible MAHs by risk ranking.
  • Hazard and Operability HAZOP technique is a process of hazard and operability issue identification that can include or be followed by a risk ranking process to identify credible MAHs.
  • HAZOPs uses a structured approach, to obtain comprehensive coverage of all relevant operability hazards. HAZOP study identifies the process system design issues, some of which might lead to MAH.
HAZOP Technique which involves the various risk ranking from no injuries to multiple fatalities
  • SIMOPS is a technique for identification of potential hazards and threats resulting from simultaneous or concurrent activities such as construction and operation, drilling and work over or drilling and operations.
  • The scale and severity of restrictions imposed through SIMOPS document indicate the potential for major accidents in case the activities are allowed for simultaneous execution.
  • The associate risk of such scenarios will be captured in MAH risk register with appropriate barriers to mitigate the consequence.
  • Quantitative risk assessment (QRA) is a technique to evaluate the risk profile of facility, under its normal operations, due to both process activities and non-process activities.
  • The risk identified from both activities will be captured in MAH Risk Register.

What Does an MAH Risk Register Contain?

The MAH Risk Register is developed to capture major accident events identified from applicable safety studies. The register is structured so that each MAH scenario can be traced from hazard identification through risk assessment, safeguard review, recommendation and action completion.

Typical fields include:

  • Bow Tie Reference
  • Hazard
  • Causes (Threat)
  • MAH Scenario Description
  • Consequence / Impact Description
  • Legal or Other Compliance Requirement Reference
  • Existing Preventive safeguards
  • Existing Mitigation safeguards
  • Inherent Risk for all four categories (People, Asset, Environment and Reputation)
  • Recommended additional Preventive safeguards
  • Recommended additional Mitigation safeguards
  • Residual Risk for all four categories (People, Asset, Environment and Reputation)
  • Implementation date for recommendations (additional safeguards / control measures)
  • Accountable person
  • Incorporated Controls / Resolution
  • Assurance activities
  • References and Links of relevant safety studies
  • HSE Opportunities for improvement
  • Action Completion Status
  • Remarks / Comments
MAH risk register in site survey report with due consideration of existing safeguards, its condition, relevance and effectiveness.

The MAH identified from safety studies (HAZOP, HAZID, QRA, etc.) and Risk register will be updated throughout the project life with input from Technical site survey report which shall aid in the population of  MAH risk register with due consideration of existing safeguards, its condition, relevance and effectiveness. Outcomes from Bow Tie development workshop, MCEs and MCTs Identification workshop, Performance Standard development exercise for MCEs and MCTs,

ALARP Demonstration for MAH Risk Register Recommendations

MOPO development exercise, Vehicle impact assessment and QRA are also updated in MAH risk register throughout the project life cycle. The ALARP demonstration shall be done for all recommendations identified in MAH Risk Register. ALARP demonstration requires the following steps:

  • MAH hazard identification and risk reduction measures (RRM) identified (MAH HAZID/ENVID, HAZOP).
  • Consequence and frequency assessment (LOPA/SIL, Bow Tie analysis, FSA).
  • Aggregation and assessment of risk demonstrating that all risk are within acceptable or acceptable if ALARP region (QRA).
  • Identification and assessment of further RRMs (ALARP Demonstrations).
  • Demonstration that further RRMs have been adopted or provide disproportionately low risk reduction as compared to the cost of implementation

Cost Benefit Analysis for MAH Recommendations

The Cost Benefit Analysis is performed for all recommendations taken from MAH Risk Register, except for the recommendations that meet the below mentioned criteria.

  • Basic engineering study is required to estimate the bill of material which in turn is required to carry out a cost benefit analysis
  • The implementation of high/low deviation alarms in the current distributed control system (DCS), as well as alterations to control logic without the incorporation of new instruments, are proposed
  • The modification of emergency shutdown (ESD) interlocks through logic adjustments without the addition of new instruments is suggested
  • Designating existing alarm as critical alarm
  • The proposed actions include updating the Standard Operating Procedure (SOP), incorporating dead zones for corrosion monitoring, and enhancing the frequency of preventive maintenance
  • P&ID and other document corrections
  • Studies including alarm audits
  • Low-cost recommendations, such as the provision of NRVs and blinds, are suggested.

MAH Risk Register and Safeguard Management

The MAH risk register prepared comprehensive for each production facilities / stations / operating units/ equipment specific MAH scenarios so that the identified and listed safeguards are not generic but very specific to the MAH scenario under consideration. The identified inadequacies and recommendation will be captured in MAH risk register. Criticality ranking of all recommendations from a risk based perspective will be done. The recommendations will be mapped against the relevant CCPS PSM element(s).

The image represents a process safety management system framework structured like a house, divided into four main pillars: Commit to Process Safety, Understand Hazards and Risks, Manage Risks, and Learn from Experience. Each pillar contains supporting components. The Commit to Process Safety section, shown in yellow, includes process safety culture, compliance with standards, process safety competency, workforce involvement, and stakeholder outreach. The Understand Hazards and Risks section, in orange, includes process knowledge management and hazard identification and risk analysis. The Manage Risks section, shown in blue, covers operating procedures, safe work practices, asset integrity and reliability, contractor management, training and performance assurance, management of change, operational readiness, conduct of operations, and emergency management. The Learn from Experience section, shown in green, includes incident investigation, measurement and metrics, auditing, and management review and continuous improvement. These pillars support the overarching process safety management system represented as the roof of the structure.
PSM System

The findings of MAH risk register for each Production Facilities / stations and operating units will be prepared as a separate detailed Draft Report for review and approval with tangible examples from best practices, case studies, etc. Final report will be submitted upon incorporation of all comments

MAH Risk Register Services in Qatar

iFluids Engineering and Consultancy WLL provides MAH Risk Register services in Qatar for high-hazard industrial and process facilities. The scope can be adapted to project and operational requirements and may include development, review, consolidation, updating and tracking of MAH scenarios and associated safeguards.

The MAH Risk Register can integrate findings from:

  • HAZID and HAZOP Studies
  • Quantitative Risk Assessment (QRA)
  • LOPA / SIL Assessment
  • Bow-Tie Analysis
  • SIMOPS Study
  • Technical Site Survey
  • MCE and MCT Identification
  • Performance Standards
  • MOPO Development
  • Vehicle Impact Assessment
  • ALARP Assessment
  • Process Safety Management requirements

The approach is applicable to facilities across oil and gas, LNG, petrochemical, chemical, power, energy and other high-hazard process industries.

MAH Risk Register Report and Deliverables

The findings of the MAH Risk Register assessment for each production facility, station, operating unit or applicable equipment group can be prepared as a separate detailed draft report for client review and approval.

The report can include identified MAH scenarios, existing safeguards, risk ranking, additional recommendations, action status, assurance activities and supporting safety study references. Following review and incorporation of client comments, the final MAH Risk Register report is submitted with the relevant supporting documentation.

Conclusion

An MAH Risk Register provides a structured way to identify, assess and manage major accident scenarios throughout the lifecycle of a high-hazard facility. By linking MAH scenarios with safeguards, risk reduction measures, ALARP assessments, assurance activities and action tracking, it supports a more traceable and systematic approach to major accident hazard management. iFluids Engineering and Consultancy WLL supports MAH Risk Register development and associated process safety assessments for industrial facilities in Qatar.

Frequently Asked Questions